Project Description
Temp Air Company completed a major mechanical infrastructure upgrade at the Baltimore County Detention Center, installing new chillers, cooling towers, and variable frequency drives (VFDs) across the Annex, Kenilworth, and Bosley Buildings. The project modernized critical cooling systems to improve energy efficiency, operational reliability, and long-term performance within the active correctional facility.
The scope included the removal and replacement of aging mechanical equipment, installation of high-capacity chillers and cooling towers, and integration of VFD technology to optimize system performance and reduce energy consumption. Extensive coordination was required to seamlessly connect new equipment with existing infrastructure while maintaining uninterrupted operation of essential building systems.
Working within a secure detention environment required detailed planning, strict adherence to security protocols, and close collaboration with Baltimore County staff to coordinate access, material deliveries, and construction activities. Temp Air successfully managed the project’s logistical challenges while maintaining safety, quality, and schedule performance.
Comprehensive quality assurance included equipment inspections, system testing, start-up, and commissioning to verify all systems met project specifications and operational requirements. The completed project provides the Baltimore County Detention Center with reliable, high-performance mechanical infrastructure that enhances facility operations while demonstrating Temp Air Company’s expertise in delivering complex upgrades within highly secure, occupied environments.
Project Details
| Location: | Baltimore, MD |
| Completion Date: | December 1, 2025 |
| Value: | $5,814,031 |